Joint venture developer SGN Mitheridge has submitted hybrid plans for the site, which is one of the last undeveloped sites in Wandsworth town centre

The mixed-tenure scheme is to be developed with four main buildings ranging from 10-30 floors and will cost around £290m to build over six years.

Read more here.